GBA plans new buffer zone roads near Bellandur Lake to ease Bengaluru traffic

GBA Chief M. Maheshwar Rao has ordered surveys for a new road in the Bellandur Lake buffer zone and fast-tracked multiple buffer road projects to ease traffic congestion in East and South Bengaluru.

author-image
Dhanya Reddy
maheshwar rao
Advertisment
  • Survey ordered for road inside Bellandur Lake buffer zone
  • 1.4 km buffer road planned as alternative to Wind Tunnel Road
  • 2.6 km Ejipura–Sarjapur buffer road construction reviewed

Chief Commissioner M. Maheshwar Rao orders detailed surveys and fast-tracks multiple buffer road projects in East and South Bengaluru to reduce congestion on key arterial roads.

In a major move to address traffic congestion in Bengaluru, the Chief Commissioner of the Greater Bengaluru Authority (GBA), M. Maheshwar Rao, has directed officials to carry out a detailed feasibility survey for constructing a new road within the Bellandur Lake buffer zone.

The direction was issued during an inspection of several locations under the East and South City Corporation limits on Tuesday. Officials have been instructed to examine available land parcels within the buffer zone and assess whether a road can be built without issues. A comprehensive report on the feasibility of the project has been sought.

Also Read:Marathahalli Bridge Junction to see traffic diversions, alternate routes from Dec 22

According to officials, the proposed road will be around one kilometre long and 24 metres wide. Apart from serving as a traffic corridor, the road is planned to include space for public movement and recreational activities. Once completed, it is expected to significantly ease traffic pressure on the Bellandur Lake bund road, which currently witnesses heavy congestion.

During the inspection, Mr. Rao also stated that preparatory work has begun for constructing a 1.4-kilometre-long buffer road as an alternative route to the busy Wind Tunnel Road. The land required for this project belongs to Hindustan Aeronautics Limited (HAL), and consent has already been obtained from HAL authorities.

Tenders for this buffer road project have been floated, and the GBA is in the process of securing government approval. Officials have been instructed to begin construction at the earliest once clearances are in place.

Also Read:RCB’s calm before the storm: Red Army build a balanced squad at the mini auction

In addition, the GBA Chief reviewed the progress of the ongoing 2.6-kilometre buffer road project that connects Ejipura Inner Ring Road to Sarjapur Outer Ring Road. This road is expected to play a key role in improving connectivity between major traffic corridors in the city.

Bengaluru GBA Commissioner Maheshwar Rao Bengaluru infrastructure Bengaluru roads Bellandur Lake
Advertisment