CM Siddaramaiah inaugurates 700-metre Hebbal Flyover loop

Chief Minister Siddaramaiah inaugurated the 700-metre Hebbal flyover loop on Monday. Built by BDA and widened to two lanes, the loop will ease traffic towards Mekhri Circle, with Phase 2 work underway for airport-side commuters.

author-image
Dhanya Reddy
HEBBAL FLYOVER INAUGURATION-BENGALURU
Advertisment
  • CM Siddaramaiah inaugurates 700-metre Hebbal flyover loop
  • Two-lane loop offers signal-free travel from KR Puram/Nagawara to Mekhri Circle
  • Phase 2 and a proposed 2 km tunnel aim to further ease Hebbal congestion

The BDA’s two-lane elevated loop at Hebbal Junction, was inaugurated by CM Siddaramaiah on Monday, promising smoother travel and marking the Congress government’s first major road project.

Bengaluru’s much-congested Hebbal Junction is set to breathe easier as Chief Minister Siddaramaiah on Monday inaugurated a 700-metre elevated loop built by the Bangalore Development Authority (BDA). The new two-lane carriageway, expanded from the earlier single-lane loop, aims to ease the city’s busiest traffic corridor by offering signal-free movement for vehicles from KR Puram and Nagawara towards Mekhri Circle.

Also Read:Bengaluru: Hebbal flyover ramp to open before August 15; promises traffic relief

Adding prominence to the event, Deputy Chief Minister DK Shivakumar, BDA President N A Haris, Revenue Minister Krishna Byregowda, MLAs S R Vishwanath, Byrathi Suresh and Sandalwood actress Ramya also participated in the inauguration ceremony, drawing attention from both political and public circles.

This project marks the first major road infrastructure launch by the Congress government since it returned to power more than two years ago. Officials highlighted that the widened loop will cut down the need for constant traffic police intervention at Hebbal, where airport-bound and city-bound vehicles often clashed, causing gridlocks.

Also Read:BDA acquires 5,755 acres for Kempegowda Layout expansion in Bengaluru

The launch, however, is just the first phase. Phase 2 construction is already underway, with BDA building another two-lane loop to allow smoother entry for vehicles from the airport and Kodigehalli side. This work is expected to be completed within the next three months, offering commuters further relief.

Yet, traffic experts caution that the junction’s woes will not end entirely. Vehicles traveling between KR Puram and BEL Circle will still face bottlenecks. While an underpass was initially planned, the government is now proposing a 2 km tunnel road, seen as a long-term solution to untangle Hebbal’s notorious traffic snarls.

Also Read:

1.Bengaluru: Fans demand Shankar Nag’s name for Ragigudda metro station on Yellow Line

2.CM Siddaramaiah flags delay in ₹880 crore central grant for SCSP/TSP schemes

Siddaramaiah D K Shivakumar
Advertisment