Tunnel Road race heats up: Adani vs Tata in fray for Bengaluru’s Rs 17,698 cr mega project

Bengaluru’s Rs 17,698 crore tunnel road project sees Adani, Tata, and 8 other top firms show interest in the pre-bid meeting. The controversial plan is moving ahead despite public criticism.

author-image
Dhanya Reddy
Tunnel Road-Bengaluru-Bidding

Photograph: (AI)

Advertisment
  • Adani & Tata show interest in Bengaluru’s tunnel road bid
  • Rs 17,698 Cr project to be built in two phases from Hebbal to Silk Board
  • Winning firm to invest 60% and collect toll for 30 years

Top infrastructure giants like Adani and Tata have expressed interest in Bengaluru’s contentious 16.75 km tunnel road project between Hebbal and Silk Board, making it a high-stakes urban venture.

Bengaluru’s ambitious and highly debated tunnel road project is gaining momentum, as top national infrastructure players step forward to bid for its construction. The proposed 16.75 km underground stretch from Esteem Mall, Hebbal to Silk Board is estimated to cost Rs 17,698 crore and will be built in two phases, Esteem Mall to Sheshadripuram and Sheshadripuram to Silk Board.

Despite sharp public criticism over toll costs, traffic impact, and exclusion of public transport, the government, especially Deputy CM D K Shivakumar, has remained firm on pushing the project forward. The recent pre-bid meeting held at the B-SMILE office in Vasanthnagar saw participation from 10 major infrastructure firms, including Adani Group and Tata Projects, sparking a high-stakes showdown.

Also Read:MP PC Mohan slams Bengaluru Tunnel Road DPR for dropping bus lanes

Other interested firms include L&T, Megha Engineering, Jayashankar Constructions, Seagle India Ltd, Vish Samudra Engineering Ltd, ITD Cementation, IRB Infrastructure, and Afcons Infrastructure. The company that wins the bid must invest 60% of the cost (around Rs 10,000 crore), while BBMP will cover the remaining. The winning firm must deposit Rs 40 crore and will be granted rights to collect tolls for 30 years.

This pre-bid response has raised expectations, even as the tunnel project remains under scrutiny for its feasibility and public benefit.

Also Read:

1.Bengaluru: Global tenders invited for 16.7-km tunnel road linking Hebbal and Silk Board

2.Karnataka forms Anti-Narcotic Task Force to tackle Bengaluru’s drug menace

3.Bengaluru: Hebbal flyover ramp to open before August 15; promises traffic relief

Tunnel road Adani Tata Deputy CM D K Shivakumar
Advertisment